Universal Washroom

Project Name Client Name Project Value
Universal Washroom York Catholic District School Board $110,000.00

Convert existing big storage room into a new universal washroom. Install new drywall partition in between the existing storage space and the new universal washroom. Cut existing block wall for a new accessible door. Install new flooring. Install ADO to new door. Install new washroom and sink. Perform electrical work to suit new layout. Paint work throughout the new washroom.

Category: General Construction Category: Health Care and Institutional Category: Offices